How we work

Four words have summed up our work since 1993: listen, plan, draw, supervise.

  1. 01We listen
  2. 02We plan
  3. 03We draw
  4. 04We supervise

A project on one line

The permit is not a stop at the end of design. The line drops to the authorities and returns, and rises to the owner at every decision that is theirs.

  1. We listen
  2. We plan
  3. We draw
  4. We supervise
OwnerOfficeAuthorities
  1. We listenPresents the idea01First meeting
  2. 02Project fileContract filing
  3. 03Reading the land
  4. We planApproves the sketch04Sketches
  5. 05Preliminary approvalGovernment authority
  6. Approves the design063D model
  7. We draw07Drawings
  8. 08Association auditEngineers Association
  9. Chooses the contractor09Quantities, contractor
  10. 10Building permitGovernment authority
  11. We supervise11SupervisionMonthly report
  12. 12Close-outConformity, occupancy

We listen

to the land

  • The sun and its path
  • Prevailing wind
  • Views worth a window
  • Street noise
  • Access and entrances
  • Slopes and levels
  • Existing trees
  • Neighbours and privacy
  • Soil, drainage and services

to the owner

Example: a villa brief

  • A generous entrance
  • Four bedrooms
  • A private garden
  • A wide garage
  • A family room away from guests
  • A kitchen that serves the garden
  • Room to grow with the family

to the authorities

Government authorities

  • Front, side and rear setbacks
  • Permitted height
  • Number of floors
  • Building ratio
  • Street level
  • Parking
  • Projections
  • Boundary walls

We understand the need and the land.

An aerial photograph of a walled plot with olive trees, bounded by a road and looking onto mountains, from a site visit

01We listen

The first call and the brief

What your land allows, and what you really need.

A project starts with a meeting with the consulting engineer, alongside a reconnaissance visit to the site. We ask how the building will be used before talking about its shape, and settle with you what you really need.

Your part
You present your idea and land.
What you receive
  • A shared understanding of the brief

02We listen

Opening the project file and collecting the land documents

The project takes a number under a numbering rule the office has used since 2003, the land documents are gathered, and the design and supervision contracts are filed with the Engineers Association.

Your part
You provide the title deed, land plan, zoning plan and land statement.
What you receive
  • Project number
  • Contracts stamped by the Association

03We listen

Seeing the land, the survey and the zoning check

Levels, setbacks, height and permitted floors.

Coordinates, levels, street level and setbacks are studied before design, using a topographic plan from a licensed surveyor and the soil report. On existing buildings, tests decide how the structure is treated before any addition.

Farmland with olive trees under cloud, as found on a first visit
Your part
You provide the surveyor's report and soil report.
What you receive
  • A clear reading of what the land allows
A 3D view of a villa entrance set in a white stone volume, with a paved terrace in front

We plan

Clear volumes, presented and reviewed.

04We plan

Sketches, reviewed with the owner in dated rounds

Clear volumes, each one there for a functional reason.

Volumes take shape from function, orientation, north and wind. You study the proposal at home, your comments return in rounds, and each round is kept with its date until the sketch is approved.

First review round of a sketch plan for a villa and its gardenSecond review round of the same planA later review round of the same plan
Your part
You review each round and approve the sketch.
What you receive
  • Approved sketch
  • A dated record of the review rounds

05We plan

Preliminary approval from the government authorities

We check your design with the authorities early, before the detailed drawings.

On unusual sites and cases we seek preliminary approval before committing to detail, because the application of the regulations varies from case to case. It is a short step that protects the owner from a costly redesign.

Your part
You decide with us whether your case calls for this step.
What you receive
  • The licensing authority’s preliminary decision

06We plan

The 3D model for approval, then design development

You see the building at its real dimensions.

We start with a material board so you can choose what is closest to you, and the 3D model then needs small edits rather than a redesign. The model is built to true dimensions, so the technical drawings later come out of it.

A cantilevered stone volume, from the 3D view of a villa
Your part
You choose the direction and approve the design.
What you receive
  • Material board
  • Approved 3D design
An architectural section with the Smeirat title block, from a real drawing set

We draw

From idea to a drawing that is audited, permitted and built.

07We draw

Architectural, structural and MEP drawings

Every detail is asked one question: how will this actually be built?

The responsible architect coordinates structure, electrical and mechanical, and discusses what each request does to the plan. Electrical and mechanical work is prepared with registered supporting offices, and a senior engineer reviews the drawings before they leave the office.

Your part
You are consulted on decisions that affect use and cost.
What you receive
  • A drawing set in four disciplines

08We draw

Engineers Association audit and certification

One auditor per discipline, and a recorded reply to every comment.

Drawings are submitted electronically to the Jordan Engineers Association and audited by a specialist in each of architecture, structure, electrical and mechanical. Comments return to the office, which amends and replies until the drawings are certified, along with Civil Defence and Public Security requirements where they apply.

Your part
You sign the forms required of the owner.
What you receive
  • Certified drawings, valid for five years

09We draw

Quantities and choosing the contractor

The building contract is part of the permit file, so it comes first.

Structural quantities are calculated, and we share what we know about contractors and construction before you choose. A detailed bill of quantities and specifications is a service agreed with the owner.

A reinforcement mat ready in a wall footing, from site photographs
Your part
You choose the contractor and sign the building contract.
What you receive
  • Structural quantities
  • Building contract ready for the permit file

10We draw

The building permit

A complete file, submitted as soon as the Association has finished.

The file holds the building and supervision contracts, the land, antiquities and safety undertakings and the required statements, and may pass through a local or regional committee. The construction permit is issued for one year, followed by the excavation permit.

Excavation on an apartment building site
Your part
Owner signatures and clearance certificates.
What you receive
  • Construction permit
  • Excavation permit
Raft foundation reinforcement on an apartment site before the pour

We supervise

On site, where everything we drew is tested.

11We supervise

Construction with a resident engineer: daily and monthly reports, material approvals

What happens on site is written, dated and photographed.

A resident engineer works under a formal appointment letter and reads the drawings ahead of each stage to catch what is missing early. Weather, crew, work, materials and photos are recorded daily, and a monthly report goes to the Association. The founder visits the site regularly.

Slab props on a floor under constructionSlab reinforcement before the pourDated concrete test cubes on site
Your part
You follow progress and decide on any change, knowing its effect.
What you receive
  • Daily and monthly reports
  • Structural receiving reports
  • Material test results

12We supervise

Conformity certificate, as-built drawings and close-out

A project ends when its file closes.

The Association issues the structural conformity certificate, its register is lodged with the licensing authority, and the occupancy permit follows with drawings of what was actually built. Post-completion transactions have their own stage in the project file, so it does not close before they do.

The stone facade of an apartment building near handover
Your part
You receive your building and its file.
What you receive
  • Conformity certificate
  • Occupancy permit
  • As-built drawings

Who stamps what

Every building in Jordan passes through several of these doors. Knowing what each one asks for, and when, is half an architect's work.

  • Department of Lands and Survey

    Step 2

    Title deed and land plan: the starting point of any project.

  • Jordan Engineers Association

    Step 2 · 8 · 11 · 12

    Contract filing, audit of drawings in four disciplines, supervision follow-up and the conformity certificate.

  • Civil Defence

    Step 8

    Fire-prevention study within the drawing file.

  • Public Security

    Step 8

    An approval within the drawing file, on a form the owner signs.

  • Greater Amman Municipality

    Step 5 · 10 · 12

    Preliminary approval, construction permit, conformity register and occupancy permit.

  • Local, regional and central planning committees

    Step 10

    The decision on cases beyond ordinary authority, such as setbacks and heights.

  • Municipalities and special zoning committees

    Step 10

    The permit route outside Greater Amman.

  • Department of Antiquities

    Step 10

    An undertaking or approval where the land calls for it.

Standards you can see

Quality in an engineering office is a record that can be checked.

From the file, as it is

Real papers from live projects. We hid the names of owners and engineers and the plot numbers, and kept the work itself.

  • Site receiving report
  • Daily report
  • Monthly report
  • Site receiving report
    ReceivedSlabFoundationsFootingsColumns

    Ground floor slab: receiving notes

    1. Rib (25 cm): add 3Φ14, 4 m long (top).
    2. Rib steel over the panel: add 2Φ10 behind the column, 4 m long.
    3. Beam B1: add 2Φ18, 4 m long, along the cantilever.
    4. Tie the bottom steel.
    5. Raise the top mesh by 3 cm where it rests on the ribs, by raising the rib chairs.
  • A daily site report: crew, the day’s work and a photograph
  • A monthly report: completed work stages and photographs of the building

Project management

When the office manages a project, every party works through one coordination point and one work schedule.

  • Owner
  • Main contractor
  • Subcontractors
  • Suppliers
  • Materials lab
  • Supporting offices
  • Government authorities
Smeirat

Every party keeps its own schedule, and the owner follows them all alone.

  1. Excavation
  2. Structure
  3. Services
  4. Plaster
  5. Finishes
Planned date
Everyone's own schedule
One work schedulePrepared with the main contractor, divided into weekly plans, with each week's progress assessed.
Who coordinates with whom?
Coordination in advanceThe sequence of work is arranged ahead with all the engineers and trades involved.
Every dispute a phone call
A weekly meetingBrings the trades together to organise their work, resolve what arises and plan the next week.
Orders without quantities
Quantities and ordersAn appointed quantity surveying office, with steel and cement orders compared to what was calculated for each slab.
Which material, which supplier?
Materials and suppliersMaterials are discussed with the owner in advance, and prices are sought from trusted suppliers.
The owner is last to know
Reports to the ownerWeekly or fortnightly, showing progress and the plan for the next week.
Paid before it is done
Agreements and paymentsThe office prepares agreements with the trades and arranges their payments according to work done.
Spending without a record
Expense statementsA schedule of expenses with their invoices, and an estimate for the following week.
Site adrift from the drawings
Site and office supervisionFollowing the work on site, and reviewing the architectural and structural work in the office.

Illustrative diagram. The scope of management services is set in each project's agreement.

Structural receiving points

  1. Foundations
  2. Footings
  3. Columns
  4. Slab

The receiving report is signed by the resident and supervising engineers.

For those who build with us

projects since 1993
610+
dated daily site reports
1,548
disciplines in every drawing set
4

General notes

  1. A drawing register per project

    Every drawing has a discipline, version, status and purpose of issue, on principles drawn from ISO 19650 for information management.

  2. Approval before site

    What is uploaded reaches the resident engineer only after review, and a rejection comes with its reason.

  3. A resident engineer per supervised project

    Under a formal appointment letter, seeing only the files of their own project.

  4. A reference of real projects

    An archive of work since 1993 that the team returns to for every solution.

  5. Coordination of supporting offices

    The responsible architect is the coordination point between disciplines and registered offices.

  6. Association classification

    A consultancy office registered with the Jordan Engineers Association, with a professional licence from Greater Amman Municipality.

What every owner asks

How do Smeirat’s stages map to RIBA and AIA?

Listen maps to RIBA 0 and 1 and AIA Pre-Design. Plan maps to RIBA 2 and 3 and AIA Schematic Design and Design Development. Draw maps to RIBA 4 and AIA Construction Documents and Procurement. Supervise maps to RIBA 5 and 6 and the AIA Construction phase.

SmeiratRIBAAIA
We listen0 Strategic Definition, 1 Preparation and BriefingPre-Design
We plan2 Concept Design, 3 Spatial CoordinationSD Schematic Design, DD Design Development
We draw4 Technical DesignCD Construction Documents, Procurement
We supervise5 Manufacturing and Construction, 6 HandoverConstruction

A comparison prepared by the office for clarity; it does not imply endorsement by RIBA or AIA. In Jordan the building permit follows the Association’s audit of detailed drawings, so it falls within RIBA 4 here. RIBA Stage 7 (Use) has no matching step in our current work.

What documents does an owner need to start designing a house in Jordan?

The title deed, land plan, zoning plan, land statement, topographic plan, surveyor's report, soil report and a materials testing contract.

How long does a building permit take in Amman?

It varies with the type and location of the project. In our files the Engineers Association completed its audit in a median of 18 days, and what follows depends mostly on complete documents, so we prepare them with the owner before filing.

How can a permit file be shortened?

In our files, about three quarters of municipality requests were for documents rather than design changes. Papers and signatures should be ready before filing.

What is re-certification?

Any design change after approval needs a letter from the office listing the changes, and the Association issues a new contract and drawing set. Certified drawings are valid for five years.

What is the difference between a conformity certificate and an occupancy permit?

The conformity certificate is issued by the Engineers Association and covers the structure. The occupancy permit is issued by the municipality and allows the building to be used.

How long is a building permit valid?

One year. A permit expiring before its procedures finish does happen, so its validity is tracked from the day of issue.

What does a resident engineer do?

Reads the drawings ahead of each stage, writes a daily report, takes part in receiving foundations, columns and slabs, follows material tests and feeds the monthly report to the Association. Excavation may not proceed without engineering supervision.

What should be checked before buying land?

Permitted setbacks, height and floors, land and street levels, the need for retaining walls, and access to sewerage. These decide what can be built and at what cost before any design.

We start with step one

A short call to hear your idea and learn what your land allows, then we tell you the next step.